Thank you for pre-ordering with us. This page is the single source of truth for where your order is. We update it every time something changes, so you never have to dig through your inbox.

Luxury Peru Collection
Premium Pima cotton, crafted in Peru.
Long-Sleeve Crews

Long-Sleeve Crews

Pima cotton · Made in Peru
✓ On track

Estimated shipping: 2 to 4 weeks · from your order date, shown on every Pima product page

  1. Fabric
    sourced
  2. Cutting
  3. Sewing
  4. Quality
    check
  5. Importing
  6. Shipping

Short-Sleeve Crews

Pima cotton · Made in Peru
✓ On track

Estimated shipping: 2 to 4 weeks · from your order date, shown on every Pima product page

  1. Fabric
    sourced
  2. Cutting
  3. Sewing
  4. Quality
    check
  5. Importing
  6. Shipping
Long-Sleeve 2-Button Polos

Long-Sleeve 2-Button Polos

Pima cotton · Made in Peru
✓ On track

Estimated shipping: 2 to 4 weeks · from your order date, shown on every Pima product page

  1. Fabric
    sourced
  2. Cutting
  3. Sewing
  4. Quality
    check
  5. Importing
  6. Shipping

Short-Sleeve 2-Button Polos

Pima cotton · Made in Peru
✓ On track

Estimated shipping: 2 to 4 weeks · from your order date, shown on every Pima product page

  1. Fabric
    sourced
  2. Cutting
  3. Sewing
  4. Quality
    check
  5. Importing
  6. Shipping

Long-Sleeve Collarless Button-Downs

Pima cotton · Made in Peru
✓ On track

Estimated shipping: 2 to 4 weeks · from your order date, shown on every Pima product page

  1. Fabric
    sourced
  2. Cutting
  3. Sewing
  4. Quality
    check
  5. Importing
  6. Shipping

Short-Sleeve Collarless Button-Downs

Pima cotton · Made in Peru
✓ On track

Estimated shipping: 2 to 4 weeks · from your order date, shown on every Pima product page

  1. Fabric
    sourced
  2. Cutting
  3. Sewing
  4. Quality
    check
  5. Importing
  6. Shipping
Core Collection
Our signature everyday pieces.
Long-Sleeve Button-Downs

Long-Sleeve Button-Downs

Gen 5 · 10 colorways
✓ Delivered

Delivered · every pre-order in this batch has shipped from Michigan and arrived

  1. Fabric
    sourced
  2. Cutting
  3. Sewing
  4. Quality
    check
  5. Importing
  6. Shipping
Knit Blazer

Knit Blazer

Gen 2 · Navy, Carbon Black, Oatmeal
✓ Delivered

Delivered · every pre-order in this batch has shipped from Michigan and arrived

  1. Fabric
    sourced
  2. Cutting
  3. Sewing
  4. Quality
    check
  5. Importing
  6. Shipping
Short-Sleeve Button-Downs

Short-Sleeve Button-Downs

Gen 5 · Dusty Pink: Pima remake, mid-October
⚠ Updated

Estimated shipping: Mid-October · Pima remake with a new production partner

  1. Fabric
    sourced
  2. Cutting
  3. Sewing
  4. Quality
    check
  5. Importing
  6. Shipping
Honest update on Dusty Pink: the original run failed our quality bar (a button placement error across the whole batch), so we refused it and moved production to a new partner. The remake is cut from our Pima cotton blend at no extra cost and is expected to ship mid-October.
Long-Sleeve 2-Button Polo

Long-Sleeve 2-Button Polo

Gen 2
✓ Delivered

Delivered · every pre-order in this batch has shipped from Michigan and arrived

  1. Fabric
    sourced
  2. Cutting
  3. Sewing
  4. Quality
    check
  5. Importing
  6. Shipping
Updates from the Team

Every 2026 classic has been delivered

The classic-fabric 2026 run is done: every pre-order for the long-sleeve button-downs, the knit blazers, and the 2-Button Polo has shipped from Michigan and arrived. If yours hasn't shown up, or something about it isn't right, write to support@noblethreads.com and we'll sort it out. Pima Enhanced pieces are still pre-orders that ship in 2 to 4 weeks from your order date, and the Dusty Pink short-sleeve remake is still expected mid-October.

The 2026 classics have landed and are shipping now

The classic-fabric 2026 run has cleared customs and is in our Michigan warehouse: the long-sleeve button-downs, the knit blazers, and the 2-Button Polo. Those pre-orders are shipping now, and you'll get a shipping confirmation with tracking as yours goes out. From today their product pages show a normal Add to cart. Pima Enhanced pieces (the crews, the Pima polos, the collarless button-downs, and the Pima Midnight Black long-sleeve) are still pre-orders and ship in 2 to 4 weeks from your order date; the button on each product page says so. The Dusty Pink short-sleeve remake is still expected mid-October.

Dusty Pink remake moves up to mid-October

Good news for anyone waiting on the Dusty Pink short-sleeve: the Pima remake is ahead of the December estimate and is now expected to ship mid-October. The product page, cart and this page all show the same window now, so there is one date to keep track of. Everything else in the 2026 run is still on track for late September.

Inspection passed, your order is being imported

Big milestone: the 2026 pre-order run passed independent final inspection and has been released for import. Every batch is now in transit to our Michigan warehouse, so you'll see the Importing stage lit up on the cards above. Next stop is Shipping, with deliveries on track for late September. We'll post exact delivery windows the moment the goods land and clear customs. (The Dusty Pink short-sleeve remake is on its own timeline, now mid-October; see the September 16 update.)

If you unsubscribed from emails, updates weren't reaching you

We've been made aware that customers who unsubscribed from marketing emails weren't receiving pre-order updates. That's not okay, and it's part of why this page exists: everything we know about your order is posted here, no inbox required. We hope this new updates hub helps with visibility, and we'll keep it current every step of the way.

A thank-you for your patience: VIP upgrade and gift card credit

We know parts of this pre-order have taken longer than we originally promised, and we don't take your patience for granted. As a thank-you, we're putting together a VIP package upgrade for affected pre-orders, along with a gift card credit for your patience. We're finalizing the details now and will post them here, and email every affected customer directly, as soon as they're locked in.

Ship windows are firming up

Here's where things stand: production completes August 15, independent inspection follows immediately, and dispatch is planned for the week of August 17. Air freight quotes are already in hand and sea quotes arrive shortly. We'll post exact delivery dates the moment dispatch is booked. Marketing samples ship August 10, which means fresh photos for this page very soon. (Historical estimate: see the September 3 and September 16 updates for the current windows.)

Final inspection complete, report in review

The pre-shipment inspection of the finished goods wrapped up on August 5. The independent inspection team has submitted their report and it's in final review now. The moment it clears, those goods are released to ship.

Production milestone: inspection begins

The finished pieces from this pre-order cycle (long-sleeve button-downs, short-sleeve button-downs, 2-Button Polos, and knit blazers) moved into final pre-shipment inspection with third-party inspectors on site at the factory.

A new production partner, and Dusty Pink is back on

After the QA failures below, we made a bigger decision: we've moved production to a new partner whose workshop we've been vetting all summer. First order of business: a full remake of the Dusty Pink short-sleeve in freshly custom-dyed fabric. The dye run takes about five weeks, production completes September 18–25, and it flies to us by air straight after. If your pre-order includes Dusty Pink, expect it in late September or early October. Thank you for your patience; we'd rather remake it right than ship it wrong. (Historical estimate: the remake is now expected mid-October. See the September 16 update.)

An honest update on the Dusty Pink short-sleeve

During our quality review we found that the entire Dusty Pink short-sleeve run had a button placement error: the bottom button sits a full inch higher than our spec. We don't ship pieces that miss our standard, so we refused the run rather than send it to you. The good news came three days later; see the July 30 update above.

Holding the line on quality

We reviewed full size-run samples from mass production, piece by piece, and rejected anything outside our measurement tolerances. It's slower this way, but it's the reason the shirt that arrives at your door fits the way it should.

During-production inspection results are in

Independent inspectors spent two days at the factory checking the run mid-production. They flagged a handful of measurement and stitching issues, exactly what these inspections are for, and we required corrections before anything moves to the final stage.

Samples approved, bulk production underway

Pre-production samples were approved and the factory moved into full production on the 2026 pre-order run. We also scheduled independent during-production and pre-shipment inspections so quality gets checked twice before anything ships.

Production order confirmed

The 2026 pre-order production run was confirmed: button-downs, 2-Button Polos, and the new knit blazers. Thank you for pre-ordering and making this run possible.

Not okay with the extended timelines? We understand. Contact support at support@noblethreads.com for a refund. Extended VIP benefits will be provided for those who wait.